Renovate Helping Agencies Building 1 Phase 3, Tinker Air Force Base, Oklahoma
J&A for Only one responsible source for a follow-on Firm-Fixed-Price construction contract to Mountain Point, LLC (CAGE Code: 8V9Q8).
J&A for Only one responsible source for a follow-on Firm-Fixed-Price construction contract to Mountain Point, LLC (CAGE Code: 8V9Q8).
The U.S. Army Corps of Engineers intends to award a sole-source follow-on contract to Mountain Point, LLC for Phase 3 work at Building 1, Tinker AFB, Oklahoma. The project involves providing humidity control and repairing interior administrative areas, including all design/engineering services, materials, labor, and quality control. The contract will be issued on a firm-fixed-price basis with an estimated performance duration of 365 calendar days. The estimated construction cost is between $1,000,000 and $5,000,000. Performance will take place at Tinker AFB, Oklahoma.
The U.S. Army Corps of Engineers intends to award a sole source follow-on contract to Cape Fox Expeditionary for Phase 3 at Building 1, Tinker AFB, Oklahoma, where the contractor is already performing Phases 1 and 2. The work includes all design/engineering services, materials, labor, equipment, and testing needed to provide humidity control and repair the interior administrative areas of the building. The contract will be firm fixed price, with an estimated magnitude of construction between $1,000,000 and $5,000,000. Performance is estimated to last 365 calendar days at Tinker AFB, Oklahoma.