Sewage Ejector and Line Assessment
The contractor must locate, inspect, and modify an unmapped 700–800 foot concrete-encased 4-inch cast iron sewer line and its associated distribution box, with Government personnel present for all site inspections. Work includes installing concrete-encased Schedule 40 PVC double-Y clean-outs every 300 feet, exposing and inspecting the distribution box and its 2009 leach field connections. The distribution box cover must be extended with a riser and a structural cover rated for three-ton vehicle traffic, protected by four concrete-encased steel safety-yellow bollards. All physical, material, and dimensional adjustments must be documented as Red Line As-Builts on the reference drawing. A detailed findings report must also be delivered, including recommended corrective actions for the lateral lines and comprehensive labor and material cost estimates.
Sewage Ejector and Line Assessment
Changes site visit date to 3 September 2026. (Robert S. Kerr Powerhouse 29759 Powerhouse Road Keota, Oklahoma, 74941 @10am
Sewage Ejector and Line Assessment
Sewage Ejector and Line Assessment:Reopens Solicitation from 18 August 2026 to 11 September 2026.Adds site visit information 27 August 2026.
Sewage Ejector and Line Assessment
Sewage Ejector and Line Assessment