Hulah Lake Toe Drain, Bowring, Oklahoma
This project involves the demolition of an existing toe drain system and three toe road culverts, followed by the construction of new replacements. The new toe drain system will connect to existing manholes 6 and 8. The work excludes demolishing the existing toe drain system between those two specific manholes. No specific budget amounts are detailed in the description. The location for the performance of services is not specified.