Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV22Q0003
Fort Gibson Lake Office, Wildwood PUA Waterline Installation Contractor shall provide all labor, equipment, fuel and various materials to excavate, including road boring and provide and install approx...
Fort Gibson Lake Office, Wildwood PUA Waterline Installation Contractor shall provide all labor, equipment, fuel and various materials to excavate, including road boring and provide and install approximately 3,500 feet of high-density polyethylene (HDPE) waterlines of various sizes, including, frost free hydrants, valve boxes, brass valves within the Wildwood Recreational Area, Cherokee County, Oklahoma. Work includes all aspects of the installation of new waterline, valves, valve boxes and hydrants. All aspects of the work must comply with all state and local codes. It will be the contractor’s responsibility to locate all existing underground utilities prior to any excavation activities. Contractor shall make a connection to the existing water supply and shall test all sections installed prior to back filling.