Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV21Q0072
The Scope of Work consists of preparing rock foundation, earthmoving activities, and structural concrete work to repair the storm drainage system located at John Redmond Reservoir. This project will b...
The Scope of Work consists of preparing rock foundation, earthmoving activities, and structural concrete work to repair the storm drainage system located at John Redmond Reservoir. This project will be a total turn-key contract with all work being performed by the Contractor unless otherwise stated. The contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, management, per diem, and travel necessary to complete all work in accordance with the statement of work (SOW), attached drawings, specifications, and all other contract documents and requirements.