Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV21Q0048
Amendment 1: Amendment 1 moves the proposal date from 23 Apr 2021 to 28 Apr 2021. Amendment 2: Amendment 2 incorporates the posted drawings- Layout of Water Treatment Plant, Water Tratment Plant and E...
Amendment 1: Amendment 1 moves the proposal date from 23 Apr 2021 to 28 Apr 2021. Amendment 2: Amendment 2 incorporates the posted drawings- Layout of Water Treatment Plant, Water Tratment Plant and Equipment Drawins, and the Project Office As-Built and moves the proposal due date from 28 Apr 2021 to 07 May 2021. Demolition/disposal activities shall include all vertical structures, utilities, and horizontal concrete structures such as foundations. Definable features of work performance include all aspects of underground utility work, demolition and disposal activities in accordance with all Local, State, and Federal Laws and Regulations. The subject structures are located at the Optima Reservoir Project in Texas County, Oklahoma.