Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV21Q0033
The SOW in this solicitation requires the contractor to remove the entire existing single story shower/restroom and the foundation, detaching existing utilities and re-install utilities to the new CXT...
The SOW in this solicitation requires the contractor to remove the entire existing single story shower/restroom and the foundation, detaching existing utilities and re-install utilities to the new CXT facility, preparing the site and installing the new concrete pre-fabricated CXT in the same location as the demoed facility and provide and place a reinforced concrete driveway. Amendment 0001 - (1) Change the proposal due date from 05 February 2021 to 12 February 2021. (2) Update the Period of Performance on CLIN 0002 from 90 days to 120 days. (3) Change the liquidated damages clause 52.211.12 from $4,750.00 to $750.00. (4) Incorporate the latest w age determination OK20210067, dated 01/01/2021. Amendment 0002 - (1) Incorporate the latest w age determination OK20210019, dated 01/01/2021. (2) Updated Paragraph 3.0 in the Statement of Work. Amendment 0003- (1) Change the proposal due date from 12 February 2021 to 19 February 2021 (2) Updated Section 3.1.2 in the Scope of Work