Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV20Q0158
Note: Amendment 1 has been posted. Note: Amendment 2 has been posted. This specification covers requirements for contractor-furnished materials; equipment and labor necessary to perform electrical upg...
Note: Amendment 1 has been posted. Note: Amendment 2 has been posted. This specification covers requirements for contractor-furnished materials; equipment and labor necessary to perform electrical upgrades to two (2) 50amp electrical campsites & electrical main located in Blue Creek campground in accordance with this SOW. All materials shall be like or equal to as described in Section 2.2. All work shall be accomplished in a safe, workmanlike manner and in accordance with the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, most current edition, all applicable Federal, State, and local safety codes and practices and in accordance with the building manufactures specifications and guidance. Work shall be fully completed 120 days after issuance of the notice to proceed (NTP) from the USACE contract office.