Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912BV20Q0100
The contractor shall provide all labor, transportation, materials, concrete, base material, tools, equipment, and other items required to replace the fence along the western downstream bank. The contr...
The contractor shall provide all labor, transportation, materials, concrete, base material, tools, equipment, and other items required to replace the fence along the western downstream bank. The contractor shall perform to the standards and specifications in this contract at Fort Gibson, Oklahoma.