3389 Large Class Hopper Dredge (LCHD-ESS)
The U.S. Army Corps of Engineers is seeking proposals for a new Large Class Hopper Dredge to replace the aging ESSAYONS, with a 6,500 cubic yard capacity, diesel-electric power system, and azimuthing thruster propulsion. The contract is not set aside for small businesses and requires bid guarantee, payment, and performance bonding, with liquidated damages applicable. Delivery and acceptance are FOB destination, with the vessel and all components to be delivered to Portland, OR, at U.S. Moorings on the Willamette River. The performance timeline is 1,675 days after award for delivery. Proposals are due by March 15, 2027, at 5:00 PM EST.