Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site

Notice ID:W9128F27RA063

The government seeks construction services for a bypass adit connecting into Nelson Tunnel at a sufficient distance from the surface to allow installation of a flow-through hydraulic bulkhead at the Nelson Tunnel Superfund site in the San Juan Mountains near Creede, CO. The site is an abandoned underground hard rock mine and drainage tunnel with shafts, crosscuts, and drifts, and the interim remedial action aims to reduce the likelihood of a large uncontrolled release of mine-impacted water from impounded mine pools. The selected remedy includes a new adit south of Nelson Tunnel to bypass the Portal Pool, rehabilitation of Nelson Tunnel from the bypass connection to the planned bulkhead location, and installation of a flow-control bulkhead in Nelson Tunnel plus an accessible bulkhead flow control structure in the Commodore 5 level. The acquisition is unrestricted and open to both large and small businesses and will use Best Value Tradeoff under FAR Part 15 procedures. Contractors must have an active, verified SAM registration and include NAICS code 237990 in their profile to receive an award.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST OMAHA
  PSC   Y1LC CONSTRUCTION OF TUNNELS AND SUBSURFACE STRUCTURES
LOCATION: Approximately one (1) mile north of the town of Creede in Mineral County, Colorado
Primary Contact
Jeffrey Wyant
402-***-2071


Data sourced from SAM.gov. View Official Posting »