Gavins Point Crane Rail Replacement
The U.S. Army Corps of Engineers, Omaha District, is soliciting an unrestricted project for the Gavins Point Intake Crane Rail Replacement, involving removal and replacement of the powerhouse intake crane runway rail near Yankton, South Dakota. The work includes demolition and removal of existing rail components, concrete anchors, asphalt, base plates, and grout, followed by installation and alignment of the 80-ton gantry crane rail to CMAA 70 standards over 328 ft x 2 rail centerlines, with grout pockets filled with two-component aliphatic polyurethane elastomer grout. A site visit is scheduled for 03 September 2026, and the contractor must commence work upon contract award and complete the work within 365 calendar days after receipt of Notice to Proceed, subject to change after solicitation issuance. The estimated construction cost is between $1,000,000 and $5,000,000, and the primary NAICS code is 238120 with a $19M small business size standard. The place of performance is the Gavins Point Project in Crofton, NE 68730, with the contracting office in Omaha, NE; questions must be submitted via ProjNet.