Gavins Point Raw Water Intake Zebra Mussel Mitigation
The U.S. Army Corps of Engineers Omaha District seeks a small business contractor to design and install a zebra mussel abatement system for raw water intakes at Gavins Point Project in Crofton, NE. The work includes installing tank and pump skids, power supply, and interfacing with existing flow meters. A site visit is scheduled for August 5, 2026. Work must commence upon award and be completed 210 calendar days after Notice to Proceed. The estimated construction cost is between $250,000 and $500,000.