Gavins Point Powerhouse Drain Rehab
This opportunity is a small business set-aside for the rehabilitation of drain lines at Gavins Point Dam in Crofton, Nebraska. The work involves mechanical cleaning, CCTV inspection, and Cured-In-Place Pipe lining for pipes of 3-inch, 4-inch, and 6-inch diameters. The estimated construction cost is between $100,000 and $250,000. The contractor must complete the work within 120 calendar days after receiving the Notice to Proceed. The solicitation closes on 28 July 2026.