Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9128F22B0019
**This requirement has moved to FY23. This notice will be cancelled and this requirement is moved to W9128F23B0001. See Presolicitation Notice for the new requirement number.** The work required will ...
**This requirement has moved to FY23. This notice will be cancelled and this requirement is moved to W9128F23B0001. See Presolicitation Notice for the new requirement number.** The work required will supplement the existing mitigation system and reduce the likelihood of potential unit outages caused by equipment failure, and to meet the updated safety requirement. Contractors must replace all submerged plumbing accessible from the dewatering sump area in-kind, including significant items like the 18"x18"x24" side anchor tee, 18" 90-degree base elbow, and 18"x12" 90-degree elbow. All ladders, walkways, and supports will be repaired and replaced by the contractor. This will include the installation of new walkways and ladders and the establishment of new anchor points. The contractor will replace all valve actuators, including valve linkages and reach rods, and the contract includes all labor required to install these components. Various attachment points may need replacement, such as pipes and expansion joints near the valve and pump attachments. Updated Sump Level Controllers (Transducers and PLCs), Flow Switches for the pumps, and a rooting/cleaning review of the drainage headers are all issues that need to be evaluated.