Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9128F22B0016
PRESOLICITATION NOTICE - Intent is to solicite this as a Small Business Set-Aside - Description: The scope of this project is to repair the Missouri River Bank Stabilization and Navigation Project (BS...
PRESOLICITATION NOTICE - Intent is to solicite this as a Small Business Set-Aside - Description: The scope of this project is to repair the Missouri River Bank Stabilization and Navigation Project (BSNP) Bullard Bend repair structures from RM 663.4 to RM 664.15 The BSNP structures will be brought within maintenance criteria by placing quarried stone. The damaged structures include dikes. These dikes are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the damaged BSNP structures will be rehabilitated by adding stone to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The quantity of stone for each site is intended to bring the structures to the lines and grades shown on the cross-sections. Early estimates indicate a need for between approximately 10,000 to 14,0000 tons of rock across four structures. Due to the location of these structures, it is anticipated that the stone will be placed from a barge. Magnitude: $500K to $1.5M Solicitation Date: Solicitation will be posted on or about 27 August 2022