Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9128F21Q0054
Perform an external AST inspection to include visual inspection of the containment area for tanks listed on Attachment B. The tank Inspection shall be in conformance with applicable industry standards...
Perform an external AST inspection to include visual inspection of the containment area for tanks listed on Attachment B. The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection. If UT is required per Attachment B, coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate should also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcements plates as applicable. Include all findings in the inspection report. Complete roundness survey if required per Attachment B. Provide DRAFT and FINAL inspection reports per the attached templates.