Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9128F21B0006
On or about February 8, 2021, the solicitation for Oahe - Little Pumpkin Bank Stabilization will be posted to beta.sam.gov. This is a non-personal project for the implementation of bank stabilization ...
On or about February 8, 2021, the solicitation for Oahe - Little Pumpkin Bank Stabilization will be posted to beta.sam.gov. This is a non-personal project for the implementation of bank stabilization for Hughes County, SD, adjacent to Lake Sharpe/Oahe Dam, SD. Requirements call for peaked stone revetments; placement of fill, placement of geo-textile fabric and some minor grading. The work will consist of bank and slope of approximately 1,071 linear feet of bank stone protection which include approximately 3,515 tons of Rip Rap to be placed in and around the Lake Sharpe Little Pumpkin area within Hughes County, SD. The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement of the geo-textile fabric and the rip rap product. The work shall be located approximately 4 miles east of Pierre SD, in the Little Pumpkin location at Lake Oahe, SD. The exact location will be provided by the Contracting Officer's Representative and disclosed in the specification and drawings package. For Presolicitation: At this time, Contracting is not accepting any questions. Please hold all questions until after the Solicitation has been posted and all documents have been reviewed.