Notice ID:W9128F20Q0073
Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. ...
Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain. Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation. New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc. Completion date is 270 days after Notice to Proceed. Estimated Construction Costs (only include if applicable): The estimated construction cost of this project is between $100,000 and $250,000.