Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9128F19Q0117
Amendment 0002 - Time Extension for quotes change to 20 September 2019 by 1200 (noon) CT. Amendment 0001 posted on 11 September 2019 at 1034 am. Please review and include with your quote by signing th...
Amendment 0002 - Time Extension for quotes change to 20 September 2019 by 1200 (noon) CT. Amendment 0001 posted on 11 September 2019 at 1034 am. Please review and include with your quote by signing the amendment for acknowledgement. Install drainage culverts and channelization improvements on primary emergency access instrumentation monitoring roads and secondary recreation access roads to stop rutting and wash outs from rain storm events. Also, need to improve the creek low water crossing. Concentration is on water crossing down stream of camp ground. Base: Remove and install drainage culverts and channelization of inlet area. Rise the grade of the road and construct a gravel low water crossing. The work will consist of dirt work, gravel construction and supply and install drainage culverts. Option: Construct a reinforced concrete low water crossing next to the drainage culverts, in lieu of a gravel low water crossing. This is a best value soliciation. See Evaluation - Other than Commercial Items for information that is required to be submitted with your quote. Estimated construction magnitude is between $100,000 - $250,000.