Inactive
Notice ID:W9128F-22-R-0006
UPDATE 12 APR 2022: For contractors that would like to submit their proposal via DOD Safe Access File Exchange (SAFE) must request a package invitation from the Contract Specialist listed in Section 0...
UPDATE 12 APR 2022: For contractors that would like to submit their proposal via DOD Safe Access File Exchange (SAFE) must request a package invitation from the Contract Specialist listed in Section 00 22 00 a minimum of 48-business hours prior to the close of RFP. For the purpose of determining whether the proposal was received "late" in accordance with FAR 15.208, the date and time the file(s) are received by the USACE Outlook Server or uploaded into the DOD SAFE website as identified in the DOD SAFE notification e-mail sent to the Contract Specialist (s)/Contracting Officer will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous. Pleas make allowances for delays in transmittal. UPDATE 29 MAR 2022: AMENDMENT 0005 issued. Uploaded questions and answers, amendment 0005, Conformed solicitation w/amendment 1-5. UPDATE 28 MAR 2022: AMENDMENT 0004 issued to incorporate changes in specification document - Attachment 1. Uploaded Conformed solicitation document, amendment 0004, amended Attachment 1. UPDATE 23 MAR 2022: AMENDMENT 0003 issued to incorporate changes per bidder inquiries, update wage rates, and extend proposal due date. UPDATE 9 MAR 2022: Upload Site Visit Sign-In Sheet UPDATE 8 MAR 2022: AMENDMENT 0002 issued to incorporate changes per bidder inquiries. UPDATE 24 FEB 2022: Updated Attachment 3 - General Mitchell_Site Walk and Visitor Access Instructions. UPDATE 16 FEB 2022: AMENDMENT 0001 issued to update Bidder Inquiry Key for ProjNet. UPDATE 14 FEB 2022: Uploaded Attachment 4 - ARW Form11_Visitor Access Form General Billy Mitchell ANGB, Wisconsin - Hydrant Fueling System: This project includes constructing a new consolidated DoD Type III Hydrant Fueling Pumphouse with control room, two above ground barrel fuel operating storage tanks with containment and the infrastructure for the Automatic Tank Gauging Equipment, filter building, distribution piping to existing loop, a new product recovery tank, extension of a fuel transfer line, supporting facilities, and associated site work. Site Walk and Visitor Access Instructions - Attached Instructions and Form 11 Visitor Access- posted 1 March 2022. Note: Attach 2 Drawings are avaliable. Please email BOTH POC's on this requirement to be emailed a link to receive the drawings.