Integrated Design Build Initial Outfitting (iDBIO) Multiple Award Task Order (MATOC) 6.0 Design Build (DB) Construction in Support of Defense Health Agency (DHA)
USACE Little Rock District anticipates an IDIQ MATOC for firm-fixed-price design-build construction and initial outfitting in support of Military Health System facilities, primarily renovation but also major repair and new construction in active healthcare facilities. Work includes mechanical/medical gas/plumbing, electrical, fire protection, architectural/building envelope, conveying, structural/antiterrorism, civil/site infrastructure, and cradle-to-grave project management, design, warehousing, installation, commissioning, warranty, and training, often on multi-phased and fast-tracked projects. The acquisition uses two-phase design-build selection, is open to unrestricted and small businesses in a single pool, and has a shared capacity of $3B, with most task orders ranging from $2M to $90M and averaging 2–3 years. The ordering period is seven years total—a five-year base plus a two-year option—with about six task orders anticipated annually and potential simultaneous projects at different locations. Performance will be in CONUS, Alaska, Hawaii, and U.S. Territories, mostly for Air Force clients with possible other DoD/Federal use, and the estimated solicitation issue date is on or about November 30, 2026.