TDA Isolated Phase Bus and Duct Inspection
The US Army Corps of Engineers, Portland District, requires testing of the Isolated Phase Bus and Duct System and abatement of approximately 100 lbs. of asbestos-containing gasket material from isolated phase bus hatch panel doors at The Dalles Lock and Dam, with off-site disposal at approved facilities. This acquisition is a 100% small business set-aside under NAICS 541380 (Testing Laboratories and Services) with a $19,000,000.00 size standard. Offerors must be registered in SAM to be eligible for award. Due to CMMC access requirements for CUI reference drawings, interested organizations must have a minimum CMMC Level 2 self-verification and submit their CMMC Unique Identifier Number and CAGE Code to the listed contacts. Nine initial attachments are included, covering the solicitation, maps, security/safety requirements, reference drawings, and wage determinations.