Vertical lineshaft pumps
This opportunity is for a 100% Total Small Business Set-Aside to supply vertical lineshaft pumps for the Big Cliff Powerhouse at Detroit Dam in Mill City, OR 97360. The contractor must deliver all required supplies within 10-14 weeks after the date of award. Award will be made to the technically acceptable offeror with the lowest evaluated price, with technical acceptability based on meeting the minimum requirements in the Purchase Description. The solicitation has been amended to revise the stainless steel material requirement, and all amendments must be reviewed, signed, and included with the quote. Questions regarding the solicitation must be submitted by 28 May 2026 at 12:00 PM PDT.