Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project will replace the existing bridge with a new fixed single-span steel girder bridge on a new alignment immediately downstream, including partial demolition, approach roadways, rock-anchored and drilled-shaft abutments, and lead/asbestos removal. The existing bridge must remain open for critical vehicular access throughout construction, likely requiring phased work, and the contractor must address environmental/seasonal restrictions and barge crane lifting near a high-voltage power line. Recent amendments revise specifications for traffic control, construction management platform, ground anchor and jet grouting qualifications, temporary environmental controls, and instructions, and provide additional Government Furnished Information such as power line layout. The period of performance is amended to allow in-water work during the 2029 and 2030 In Water Work Window years, with environmental permits and IHA marine mammal protections remaining unchanged and no IHA-governed in-water work allowed beyond permitted years. Work is performed at Bonneville Lock and Dam.