Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement requires a new fixed single-span steel girder bridge on a new alignment immediately downstream of the existing bridge, including a concrete deck, approach roadways, a rock-anchored concrete stub north abutment, a drilled-shaft-supported south abutment, and partial demolition of the existing bridge for seismic mitigation. The work includes phased construction to keep critical vehicular access open, lead and asbestos removal, environmental and seasonal restrictions, and barge-crane lifting near a high-voltage power line. Amendments revise specifications and drawings, add construction management platform and quality-control/testing requirements, update traffic-control and environmental-control provisions, change ground-anchor and jet-grouting qualifications, and provide power-line layout government-furnished information. The period of performance has been amended to allow work during the 2029 and 2030 in-water work windows, with existing environmental permits and IHA marine-mammal protections remaining in effect and no IHA-governed in-water work allowed beyond the permitted years.