Bonneville Powerhouse II Unwatering Pump Replacement
The USACE Portland District requires contractor services to replace an unwatering pump at Bonneville Lock and Dam Powerhouse II, with work performed in Skamania County, Washington, and site access via Interstate 84 near Cascade Locks, Oregon. The project involves procuring, installing, and testing a 7,000 gpm vertical turbine pump with associated piping and motor under a single firm-fixed-price contract. Physical construction must be completed within 180 calendar days after receipt of the Notice to Proceed. The estimated construction magnitude is between $500,000 and $1,000,000, and the acquisition is 100% set aside for small businesses. Offerors must comply with CMMC Level 1 (Self) requirements for any contractor or subcontractor information systems processing, storing, or transmitting Federal Contract Information.