Garibaldi Depoe Bay Pipeline Dredging 2026
This is a pre-solicitation notice for a pipeline dredging project at three locations in Garibaldi, OR and Depoe Bay, OR. The work involves dredging approximately 80,000 cubic yards and placing material at designated surf zone and in-water sites. The period of performance for physical work is from July 1, 2026 through March 15, 2027. The estimated construction cost is between $1,000,000 and $5,000,000. This procurement is anticipated to be a Small Business Set-Aside.