John Day Dam Powerhouse HVAC Upgrades
The U.S. Army Corps of Engineers Portland District requires HVAC upgrades at the John Day Dam Powerhouse, located
The U.S. Army Corps of Engineers Portland District requires HVAC upgrades at the John Day Dam Powerhouse, located
The U.S. Army Corps of Engineers Portland District seeks bids for HVAC upgrades at the John Day Dam Powerhouse, located roughly 109 miles east of Portland, Oregon, spanning both Oregon and Washington. The work includes replacing chillers with approximately 600 tons of new capacity, installing half water-cooled and half air-cooled systems with roof-mounted condensers, integrating new digital HVAC controls with fire protection and smoke isolation, and performing associated structural, electrical, and possible asbestos/lead abatement work. Contractors must meet CMMC Level 2 (Self) as a condition of award, with requirements flowed down to subcontractors. The estimated construction magnitude is between $25 million and $100 million under a single firm-fixed-price contract with full and open competition. Physical construction is anticipated to be completed 1,004 calendar days after receipt of the Notice to Proceed.
The U.S. Army Corps of Engineers requires HVAC upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon, spanning Sherman County, Oregon, and Klickitat County, Washington. The project involves replacing chillers, pumps, piping, and controls, integrating new digital HVAC and fire protection systems, with an estimated construction cost between $25 million and $100 million. Contractors must comply with Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) requirements, which apply to the prime and all subcontractors handling Federal Contract Information or Controlled Unclassified Information. Physical construction must be completed within 1,004 calendar days after receiving the Notice to Proceed. Work will occur in an active, operational powerhouse with high-voltage electrical equipment and requires strict safety and fire protection measures.
The U.S. Army Corps of Engineers requires HVAC upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon, spanning Sherman County, Oregon, and Klickitat County, Washington. The project involves replacing chillers, pumps, piping, and air handlers, integrating a new digital HVAC control system with fire protection, and installing both water-cooled and air-cooled systems. Contractors must comply with Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) for systems handling Federal Contract Information or Controlled Unclassified Information. The estimated construction cost is between $25 million and $100 million, with physical construction to be completed within 1,004 calendar days after receiving the Notice to Proceed. The tentative solicitation issuance date is July 2026.
The U.S. Army Corps of Engineers requires HVAC system upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon. The work is extensive, involving the complete replacement of primary chillers, installation of new systems integrated with digital controls and fire protection, and must be performed within an active operational facility. The estimated construction budget is between $25 million and $100 million. Physical construction is anticipated to take 1,004 calendar days after the Notice to Proceed. A critical condition of award is that the prime contractor and relevant subcontractors must have a current Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) or higher status posted in SPRS.
The U.S. Army Corps of Engineers requires HVAC system upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon. The work is extensive, involving the complete replacement of primary chillers, installation of new systems integrated with digital controls and fire protection, and must be performed within an active powerhouse with significant operational and safety constraints. The estimated construction cost is between $25 million and $100 million, with physical construction anticipated to take 1,004 calendar days after the Notice to Proceed. A critical requirement is that the prime contractor and all applicable subcontractors must possess the required Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) status to handle Controlled Unclassified Information (CUI) prior to award. This will be a firm-fixed-price contract awarded under full and open competition.