John Day Dam Powerhouse HVAC Upgrades

Inactive
Notice ID:W9127N26BA006

USACE Portland District requires HVAC upgrades at the John Day Dam Powerhouse, located about 109 miles east of Portland, Oregon, and spanning Sherman County, Oregon, and Klickitat County, Washington. The work includes approximately 600 tons of new chiller capacity, new electrical feeds, pumps, piping, air handlers, roof-mounted air-cooled condensers, digital HVAC controls integrated with fire protection and smoke isolation, localized mini-splits, structural penetrations, and possible asbestos/lead abatement in an active powerhouse. It will be a single firm-fixed-price contract awarded through an Invitation for Bids under full and open competition, with an estimated construction magnitude of $25M to $100M and anticipated physical completion 1,004 calendar days after Notice to Proceed. CMMC Level 2 (Self) or higher is a condition of award and must be current in SPRS, with Level 1 (Self) required for subcontractors handling only FCI and Level 2 (Self) or higher for those handling CUI; document access also requires active SAM registration and a current NIST SP 800-171 assessment with at least Basic confidence in SPRS. Tentative solicitation issuance is October 2026, and specifications and drawings will be included when issued; firms must have active SAM registration to participate.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers, Portland District, seeks HVAC upgrades at the John Day Dam Powerhouse, located about 109 miles east of Portland, Oregon, and spanning Sherman County, Oregon, and Klickitat County, Washington. Work includes replacing/installing primary and secondary chillers and four new chiller skid packages totaling about 600 tons, plus new electrical feeds, pumps, piping, air handlers, roof-mounted air-cooled condensers, digital HVAC controls integrated with fire protection/smoke control, and localized mini-splits, all within an active powerhouse with safety and operational constraints and possible asbestos/lead abatement. CMMC Level 2 (Self) or higher is required for the prime contractor as a condition of award, with flow-down requirements for subcontractors based on whether they handle FCI or CUI. The acquisition is a single firm-fixed-price contract under full and open competition, NAICS 238220, with an estimated construction magnitude of $25M to $100M. Tentative solicitation issuance is October 2026, and physical construction completion is anticipated 1,004 calendar days after Notice to Proceed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers Portland District requires HVAC upgrades at the John Day Dam Powerhouse, located

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers Portland District seeks bids for HVAC upgrades at the John Day Dam Powerhouse, located roughly 109 miles east of Portland, Oregon, spanning both Oregon and Washington. The work includes replacing chillers with approximately 600 tons of new capacity, installing half water-cooled and half air-cooled systems with roof-mounted condensers, integrating new digital HVAC controls with fire protection and smoke isolation, and performing associated structural, electrical, and possible asbestos/lead abatement work. Contractors must meet CMMC Level 2 (Self) as a condition of award, with requirements flowed down to subcontractors. The estimated construction magnitude is between $25 million and $100 million under a single firm-fixed-price contract with full and open competition. Physical construction is anticipated to be completed 1,004 calendar days after receipt of the Notice to Proceed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers requires HVAC upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon, spanning Sherman County, Oregon, and Klickitat County, Washington. The project involves replacing chillers, pumps, piping, and controls, integrating new digital HVAC and fire protection systems, with an estimated construction cost between $25 million and $100 million. Contractors must comply with Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) requirements, which apply to the prime and all subcontractors handling Federal Contract Information or Controlled Unclassified Information. Physical construction must be completed within 1,004 calendar days after receiving the Notice to Proceed. Work will occur in an active, operational powerhouse with high-voltage electrical equipment and requires strict safety and fire protection measures.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers requires HVAC upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon, spanning Sherman County, Oregon, and Klickitat County, Washington. The project involves replacing chillers, pumps, piping, and air handlers, integrating a new digital HVAC control system with fire protection, and installing both water-cooled and air-cooled systems. Contractors must comply with Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) for systems handling Federal Contract Information or Controlled Unclassified Information. The estimated construction cost is between $25 million and $100 million, with physical construction to be completed within 1,004 calendar days after receiving the Notice to Proceed. The tentative solicitation issuance date is July 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers requires HVAC system upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon. The work is extensive, involving the complete replacement of primary chillers, installation of new systems integrated with digital controls and fire protection, and must be performed within an active operational facility. The estimated construction budget is between $25 million and $100 million. Physical construction is anticipated to take 1,004 calendar days after the Notice to Proceed. A critical condition of award is that the prime contractor and relevant subcontractors must have a current Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) or higher status posted in SPRS.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

John Day Dam Powerhouse HVAC Upgrades

Notice ID:W9127N26BA006

The U.S. Army Corps of Engineers requires HVAC system upgrades at the John Day Dam Powerhouse, located approximately 109 miles east of Portland, Oregon. The work is extensive, involving the complete replacement of primary chillers, installation of new systems integrated with digital controls and fire protection, and must be performed within an active powerhouse with significant operational and safety constraints. The estimated construction cost is between $25 million and $100 million, with physical construction anticipated to take 1,004 calendar days after the Notice to Proceed. A critical requirement is that the prime contractor and all applicable subcontractors must possess the required Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) status to handle Controlled Unclassified Information (CUI) prior to award. This will be a firm-fixed-price contract awarded under full and open competition.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W071 ENDIST PORTLAND
  PSC   Z2EZ REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
LOCATION: Not Given
Primary Contact
Aragon Liebzeit
503-***-4610
Alt Contact
Cory Pfenning
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »