Bonneville Power House 1 Trash Rack Replacement
This project involves the fabrication, delivery, and installation of new trash racks, along with dredging, debris removal, and disposal of existing racks at the Bonneville Lock and Dam in Cascade Locks, Oregon. The required in-water work must be performed within the specific window of 15 November 2027 through 14 March 2028. The estimated construction cost is between $25,000,000 and $100,000,000. It is anticipated to be set aside for small businesses with a size standard of $45 million in average annual receipts. The work includes replacing a total of 174 trash racks and disposing of 203 existing ones.