CASCADE ISLAND SUBSIDENCE INTERIM REPAIR
W9127N19B0017
The CASCADE ISLAND SUBSIDENCE INTERIM REPAIR project is exempt from synosis IAW FAR 5.202(a)(13). Contract work will include the excavation of and removal of crane outrigger pads at the crane pads ide...