Horizontal Construction MATOC
The Mobile District COE requires one MATOC for a full range of horizontal construction, renovation, repair, and incidental design task orders primarily at 12 locations across Alabama, Florida, Georgia, and Mississippi. This is a Best Value, two-phase design-build solicitation, with one solicitation covering both phases and detailed project requirements to be provided in the RFP package. Phase One proposals will be evaluated on technical approach and performance capability to select a limited number of firms invited to submit Phase Two proposals, with detailed design requirements added by amendment at the start of Phase Two. The successful contractor must design and construct complete, usable facilities while using industry standards where allowable to allow design flexibility. Amendment 0001 was posted on 21 September 2026.