Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9127826RA046

This contract involves constructing the initial phase of the Katrina Key breakwater restoration on Deer Island, approximately 12,000 feet, to reduce wave erosion using armor stone or bioengineered reef. The contractor must comply with the new Revolutionary FAR Overhaul and meet Cybersecurity Maturity Model Certification (CMMC) Level 1 requirements for systems handling Federal Contract Information or Controlled Unclassified Information. CMMC implementation is phased, with self-assessments potentially required from November 2025, and full compliance mandated by November 2028. No specific budget amount or performance location beyond Deer Island is provided. No submission timelines are mentioned.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY US ARMY ENGINEER DISTRICT MOBILE
  PSC   Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9127826RA046

This contract involves constructing the initial phase of a rock breakwater structure, known as Katrina Key, approximately 12,000 feet long, to restore Deer Island and reduce wave erosion. The work includes placing armor stone or bioengineered reef and geocomposite to return the structure to near its 1850’s dimensions. Offerors must comply with the new Revolutionary FAR Overhaul and specific cybersecurity requirements, including maintaining a CMMC Level 1 (Self) certification for systems handling Federal Contract Information or Controlled Unclassified Information. The location for performance is Deer Island, and no budget amount is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY US ARMY ENGINEER DISTRICT MOBILE
  PSC   Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9127826RA046

Phase 1 Breakwater. Contractor will build either a bio-engineering or a rubblemound breakwater along the south-eastern tip of Deer Island.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY US ARMY ENGINEER DISTRICT MOBILE
  PSC   CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »