Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
W9127826BA003
The requirement is for hydraulic cutterhead, trailing suction hopper, and/or mechanical dredges with scows, capable of dredging to 39 feet and complete with crew, management, and support equipment. The dredged material will be maintenance sand from the Pensacola Entrance Channel, with placement west of the channel along Perdido Key Beach. The maximum pumping distance for beach placement is approximately 30,000 feet. Performance location is the Pensacola Entrance Channel and Perdido Key Beach area.