Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
The requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows capable of dredging to 39 feet, complete with crew, management staff, and support equipment such as tugs and floating plants for a large dredging operation. Expected material is maintenance sand typical of the Pensacola Entrance Channel. Dredged material will be placed west of the Pensacola Entrance Channel along Perdido Key Beach, with a maximum pumping distance of approximately 30,000 feet. Amendment 0001 was posted on 29 September 2026, Amendment 0002 on 05 October 2026, and Amendment 0004 on 06 October 2026.