Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
The requirement is for hydraulic cutterhead pipeline, trailing suction hopper, and/or mechanical dredges with scows capable of dredging to 39 feet, complete with crew, management, tugs, and support equipment for a large dredging operation. Work involves maintenance material typical of the Pensacola Entrance Channel, composed of sand. Dredged material will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000 feet.