Inactive
Notice ID:W9127825L0004
The intent of the requirement is to perform work required to support the rewind of two hydroelectric generating units at Hartwell Powerhouse, Hartwell, GA. The contractor shall be responsible for fiel...
The intent of the requirement is to perform work required to support the rewind of two hydroelectric generating units at Hartwell Powerhouse, Hartwell, GA. The contractor shall be responsible for field verifying existing drawings and creating as-built drawings.