Notice ID:W9127820R0065
The scope of work for this project includes construction of a new fueling facility consisting of above ground horizontal storage tanks with tank-mounted pumps, filter separator shelter with receipt an...
The scope of work for this project includes construction of a new fueling facility consisting of above ground horizontal storage tanks with tank-mounted pumps, filter separator shelter with receipt and issue filtration, truck fill stands, truck unload, product recovery tank, and associated infrastructure. The project also includes the replacement of the existing transfer pumps, located at the existing bulk fuel facility, along with other related mechanical and electrical modifications. The new horizontal aboveground double-walled storage tanks are 50,000 gallons each, providing a total of 150,000 gal