NOTICE TYPE: Sources Sought / Request for Information (RFI) for Market Research Purposes Only SUBJECT: Sources Sought (RFI) - JBSA 91st Cyber Operations Center (Project Number: MPLS163002 / P2: 472866...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »

Sources Sought (RFI) - JBSA 91st Cyber Operations Center (MPLS163002)

Notice ID:W9126G27RA008

USACE Fort Worth District is conducting market research to gauge interest and capability for a potential Progressive Design-Build project executed under Other Transaction Authority, with the FAR not applying. The project would construct an approximately 3,958-square-meter secure cyber operations facility at Joint Base San Antonio–Lackland, Texas, for the 91st Cyber Operations Squadron, including reinforced concrete/steel/brick construction, a 200-ton cooling system, two 3,000 KW backup generators, water-line redundancy, and ICD 503/705 secure spaces. The target construction price range is $82,560,000 to $90,912,000 within a $96,000,000 programmed amount. The Government targets Phase 1 design/preconstruction award around April 21, 2027, with an approximately 800-day period of performance after the Phase 2 construction modification. A virtual Industry Day is tentatively scheduled for October 6, 2026, with registration details expected on SAM.gov in September 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   Y1BG CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES


Data sourced from SAM.gov. View Official Posting »

Sources Sought (RFI) - JBSA 91st Cyber Operations Center (MPLS163002)

Inactive
Notice ID:W9126G27RA008

The USACE Fort Worth District is conducting market research for a potential Progressive Design-Build (PDB) project under Other Transaction Authority (OTA), not FAR-based procurement, to construct a secure cyberspace operations facility of approximately 3,958 square meters at Joint Base San Antonio (JBSA)-Lackland, Texas, supporting the 91st Cyber Operations Squadron. The facility will include reinforced concrete and structural steel construction, a 200-ton cooling system, two 3,000 KW backup generators, and secure spaces meeting ICD 503/705 standards. The target price range for construction is $82,560,000 (strict Construction Cost Limit) to $90,912,000 (estimated Construction Budget), within a total Programmed Amount of $96,000,000. The projected award date for Phase 1 (design and preconstruction services) is on or about April 21, 2027, with a period of performance of approximately 800 calendar days following execution of the Phase 2 construction modification. A virtual Industry Day is tentatively scheduled for October 6, 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES
LOCATION: Not Given
Primary Contact
Jordan Kennedy
817-***-1189
Alt Contact
Matthew Dickson
817-***-1110


Data sourced from SAM.gov. View Official Posting »