W9126G26RA109
The project involves site improvements at Stillhouse Hollow Lake in Belton, Texas, requiring the contractor to supply all tools, equipment, materials, labor, and supervision. The base work includes installing electric lines, sewer lines, a waterline for nine RV sites, concrete paving, and asphalt paving, with optional items such as a concrete road approach, a gate system, and signage. A site visit is scheduled for 27 August 2026 at 9:00 AM at 3740 FM 1670, Belton, TX. Performance of services will take place at the Stillhouse Hollow Lake location.