W9126G26RA109

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9126G26RA109

The project involves site improvements at Stillhouse Hollow Lake in Belton, Texas, requiring the contractor to supply all tools, equipment, materials, labor, and supervision. The base work includes installing electric lines, sewer lines, a waterline for nine RV sites, concrete paving, and asphalt paving, with optional items such as a concrete road approach, a gate system, and signage. A site visit is scheduled for 27 August 2026 at 9:00 AM at 3740 FM 1670, Belton, TX. Performance of services will take place at the Stillhouse Hollow Lake location.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

W9126G26RA109

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9126G26RA109

The project involves site improvements at Stillhouse Hollow Lake in Belton, Texas. The contractor must provide all tools, equipment, materials, labor, and supervision to repair utilities and perform upgrades. Base work includes electric line with pedestals, sewer line and lift station, waterline for RV sites, concrete, and asphalt paving. Optional items include a concrete road approach with culvert, a dual-swing gate system with reinforced concrete, and signage/pavement markings. A site visit is scheduled for 26 August 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

W9126G26RA109

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9126G26RA109

The contractor must supply all tools, equipment, materials, labor, and supervision to repair utilities and perform upgrades at Stillhouse Hollow Lake, Texas. Base work includes installing approximately 1,000 linear feet of electric line with service disconnects, a breaker box, nine 100-amp pedestals, about 2,000 linear feet of sewer line with a lift station, roughly 1,700 linear feet of waterline for nine RV sites, and approximately 10,000 square feet of concrete plus 2,000 square yards of asphalt paving. Optional items cover a concrete road approach with an integrated culvert and headwall, a 16-foot dual-swing gate system with 1,600 square feet of reinforced concrete, and No Parking Towing Enforced signage and pavement markings. No budget amounts or performance timelines are specified in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W076 ENDIST FT WORTH
  PSC   Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »