W9126G26RA109
The contractor must supply all tools, equipment, materials, labor, and supervision to repair utilities and perform upgrades at Stillhouse Hollow Lake, Texas. Base work includes installing approximately 1,000 linear feet of electric line with service disconnects, a breaker box, nine 100-amp pedestals, about 2,000 linear feet of sewer line with a lift station, roughly 1,700 linear feet of waterline for nine RV sites, and approximately 10,000 square feet of concrete plus 2,000 square yards of asphalt paving. Optional items cover a concrete road approach with an integrated culvert and headwall, a 16-foot dual-swing gate system with 1,600 square feet of reinforced concrete, and No Parking Towing Enforced signage and pavement markings. No budget amounts or performance timelines are specified in the description.