NVARNG AASF Fuel Farm Pump and Motor Repair
This is a requirement to replace a motor, rebuild a pump, and repair a meter at a fixed fuel farm refueling rack in Reno, Nevada, to ensure reliable fuel delivery and prevent potential failure or fire. The work must be performed on-site at the Harry Reid Training Center. The performance period for all line items is scheduled for 1-12 June 2026. The government has clarified that the system can be down for two to three days, prefers to replace both the motor and pump, and would like to replace the meter if possible. A site visit is offered on 16 April 2026 for interested parties.