Replace HVAC System
Mission and Installation Contracting Command- Fort Stewart has a requirement from Fort Stewart Directorate of Public Works (DPW) for the procurement of the replacement for the HVAC system at Building ...
Mission and Installation Contracting Command- Fort Stewart has a requirement from Fort Stewart Directorate of Public Works (DPW) for the procurement of the replacement for the HVAC system at Building ...
The Mission and Installation Contracting Command (MICC), INstallation Contracting Office (IOC)- Fort Stewart, Georgia anticipates issuing a Firm Fixed Price (FFP) Invitation for Bid to Replace HVAC Sy...
Replace failed HVAC System at Building 865 at Hunter Army Airfield. The entire system is to be replaced with a Chilled Water/VAV System. The new system will consist of a new Air Colled Chiller, (6) si...