This Performance Work Statement (PWS) defines the requirements for the Contractor to engineer, furnish, install, and test two (2) new duct-bank infrastructure pathways and two (2) new 144 strand singl...
This Performance Work Statement (PWS) defines the requirements for the Contractor to engineer, furnish, install, and test two (2) new duct-bank infrastructure pathways and two (2) new 144 strand single mode fiber optic cables. The Contractor shall comply with the U.S. Army Installation Information Infrastructure Architecture (I3A). This will enhance connectivity, provide redundancy, and provide the ability for future expansion from the HOST Building (141) and the GEO Building (5104) on Main Post to the COOP Building (30605) at Cairns Airfield. A site visit has been schedule for 6 June 2023 at 09:00 am CST. All will meet at Building 142 on Fifth Ave, Fort Novosel, Al 36362. Please be on time. Questions are due 12 June 2023 by 12 p.m. CST. Submit all questions to Mr Donald McMullen, donald.d.mcmullen.civ@army.mil AND Ms Florutha A Robinson, florutha.a.robinson.civ@army.mil. Responses will be posted NLT 30 June 2023 by COB. Soliciation will close on 21 July 2023 at 4:30 p.m. CST. NOTE: Please validate quotes for 30 September 2023. ALL QUOTES SHALL BE COST BROKEN DOWN (LABOR, INSTALLATION, ECT....).