Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91247
Inspection of 34’ towers and supplemental equipment (1) First will be a thorough inspection of the condition for each jump tower system to include the tower structure, guy wire and pulley system, guy ...
Inspection of 34’ towers and supplemental equipment (1) First will be a thorough inspection of the condition for each jump tower system to include the tower structure, guy wire and pulley system, guy wire anchor and foundation, building structure, and other areas as needed. Price includes a man lift for the 40ft pole inspection. (2) Contractor will include a safety assessment of the towers to identify any areas that place trainees, Cadre, or others at risk to bodily harm. The safety inspection findings will be cataloged separately from the condition findings but many if not will be items that pertain to both. The contractor will perform a comprehensive inspection in compliance with the TIA 222-H standard. The inspection will encompass two areas of focus. Within 30 days of Contractor arrival on-site. **See attached PWS for further details. Reason for Amendment 1: Updated NAICS and PSC NAICS changed from 333923 to 541350 PSC changed from H140 to H340 Solicitation amendment date extend from 18 November 2022 to 22 November 2022 at 2 p.m. Reason for Amendment 2: Updated NAICS NAICS changed from 541350 to 333923 Solicitation amendment date extend from 22 November 2022 to 23 November 2022 at 2 p.m.