USACE SPK DBB Construction - LAR C3B North - Sacramento, CA
Amendment 0001 applies to the Lower American River Contract 3B North project, located on the Lower American River from Howe Avenue upstream to near Harrington Way. The fully designed government-specification work includes excavation, material placement, embankment regrading, soil-filled rock slope protection, buried launchable rock toes and overbank trenches, planting benches with instream woody material, riprap import/placement, tie-ins to existing rock revetment, and temporary site stabilization. The target price range is estimated at $45,000,000 to $60,000,000. The requirement is a 100% Small Business set-aside under NAICS 237990, with an SBA size standard of $45,500,000 in annual revenue.