USACE SPK Construction - Natomas PP5, Sacramento, CA
The U.S. Army Corps of Engineers, Sacramento District, is soliciting construction of a new Pumping Plant 5 facility in Sacramento, CA as part of the American River Common Features, Natomas Basin Project, authorized by the Water Resources Reform Development Act of 2014. Pumping Plant 5 is in Reach B along the Sacramento River near the landside toe of the levee and south of Interstate 5, discharging drainage from the West Drainage Canal to the river after significant rainfall. The existing plant will be demolished and a new facility constructed about 300 feet up the canal to allow completion of Reach B levee improvements, including a seepage berm, adjacent levee work, and raising discharge pipes above the 200-year water surface elevation. An Abstract of Offers has been posted and amendments have been issued. The point of contact is Antonina Beal, Contract Specialist, and interested parties should refer to the full solicitation document for detailed instructions, clauses, and submission requirements.