Inactive
Notice ID:W9123822R0055
***Amendment 0006 has been posted to piee.eb.mil. Please use the link below to access the amendment and updated attachments.**** Access to Amendment 0006 can be found at https://piee.eb.mil/sol/xhtml/...
***Amendment 0006 has been posted to piee.eb.mil. Please use the link below to access the amendment and updated attachments.**** Access to Amendment 0006 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 ***Amendment 0005 has been posted to piee.eb.mil. Please use the link below to access the amendment. **** Access to Amendment 0005 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 ***Sign-in Sheet for second site visit conducted on November 21, 2022, is provided as an attachment below.*** ***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.*** https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 ***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. **** Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 ***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized. The site visit sign-in sheet is attached at the bottom of this announcement.**** Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam. The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00. This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*