Inactive
Notice ID:W91238-21-R-0069
***Amendment 0006 - Includes Specification Updates*** ***Amendment 0005 - Extends proposal due date*** ***Amendment 0001 is to include the range of magnitude iaw DFARS 236.204(i) $10,000,000 and $25,0...
***Amendment 0006 - Includes Specification Updates*** ***Amendment 0005 - Extends proposal due date*** ***Amendment 0001 is to include the range of magnitude iaw DFARS 236.204(i) $10,000,000 and $25,000,000 plus options.*** ***Attachment 1 Drawings are too large for SAM.gov Please request a download link via DoD SAFE from POC: Vernon Simpkins, vernon.simpkins@usace.army.mil*** Description: The project will consist Construction of a new 10,000 gallon-barrel jet fuel (JP-8) tank, a transfer pump house with 600 gallon per minute (GPM) pumps and filter separators, two tank truck off-loading stations, and significantly modify the existing truck fill stand. The new transfer pump house will include pump and control rooms. The new pumps will provide a 1,200-GPM transfer flow rate. The pump station will also include filtration for off-loading receipt and for issue to the truck fill stand. The new truck off-loading system will include two tank truck receipt connection points and will provide a nominal off-loading rate of 600-GPM per truck, for a total of 1,200-GPM simultaneously. Site Visit is scheduled for July 7, 2021 Time: 1:00pm - 3:00pm