Dillon Dam, Intake Roof Replacement
The contractor must remove an existing membrane roof and install a new one with a minimum 20-year warranty on an estimated 75' by 38' structure, with a site visit recommended. The work includes supplying all flashing, materials, labor, and equipment, as well as relocating ballast for reuse and removing all waste. The contractor must keep the work area neat and maintain access for government personnel. The performance location and budget are not specified in the provided description. Additional information on the process for equitable adjustments is available through the U.S. Army Corps of Engineers website.