Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9123725QA048
Contractor shall furnish all equipment, labor, supplies, drawings, and supervision to install base materials and asphalt to include repair of existing base and painting of parking lot lines at Dillon ...
Contractor shall furnish all equipment, labor, supplies, drawings, and supervision to install base materials and asphalt to include repair of existing base and painting of parking lot lines at Dillon Lake in gravel parking lot directly adjacent to the playground and shelter to an area marked out that is approximately 40,000 square feet.