Contractor shall furnish, deliver, excavate, and install: A concrete vault restroom with chase. The excavation portion will be for the two 1,000 gal vaults, which will be installed so that base of the...
Contractor shall furnish, deliver, excavate, and install: A concrete vault restroom with chase. The excavation portion will be for the two 1,000 gal vaults, which will be installed so that base of the building (including the building itself) is level, as well as flush with ground around it. The vault restroom shall be installed within the footprint of the existing comfort station.