Notice ID:W9123722Q0090
Contractor shall furnish all equipment, labor, supplies, building drawings, and supervision to supply and install a new plumbed restroom as specified below, adjacent to the Below Dam Recreation Area a...
Contractor shall furnish all equipment, labor, supplies, building drawings, and supervision to supply and install a new plumbed restroom as specified below, adjacent to the Below Dam Recreation Area at Alum Creek Lake. The contractor shall adhere to all State and Federal building codes. The contractor is responsible for locating all utilities in the work zone(s). Work shall begin within seven (7) days of Notice to Proceed (NTP) and complete forty-five (45) days after delivery of restroom. Contractor to provide manufacturer information, product literature, and other materials to adequately reflect that the item offered meets the specifications listed in the attachment B.08.02 W9123722Q0090.