RD Bailey water treatment plant control panel upgrade
W9123721Q0134
Contractor will provide, fabricate, and install a control panel at the Visitor Center Water Treatment Plant. The enclosure shall come fully fabricated with four (4) starters, a HMI, a PLC, Power Suppl...